Summary of the Project

Unique Group’s Buoyancy & Ballast division successfully completed a 200t proof load test on the main crane on a jack-up vessel, within a day.

Client Requirement

The client, Seajacks, tasked Unique Group’s brand Water Weights to perform proof load testing on the main crane onboard the ‘Kraken’ a Seajacks jack-up vessel prior to the installation of wind farms in the North Sea. The client required a 200t load to be applied, plus 10% proof load (220t).

Unique Solution Delivered

Unique Group’s engineers had to re-think the rigging arrangement on site owing to confined space. The load had to be positioned over the deck due to port restrictions, so a standard rigging arrangement of 3 layers of proof load bags was used.

200t Load Test on Crane
200t proof load test on the main crane

The load was achieved using seven 35t proof load bags filled with water configured in one set of four and one set of three, hung from a Unique Group calibrated 250t load shackle. All rigging and loading were completed in one day to the client’s satisfaction.
 

Benefits delivered

  • On-site Support and quick mobilisation
  • Efficient and reliable method
  • HSEQ Compliant
  • Project completed within schedule

 Client feedback

Client Feedback on 200t Proof Load Test

Unique Group Expertise

With decades of experience in offshore operations, Unique Group provides comprehensive decommissioning solutions, from initial planning through final restoration. Our integrated approach ensures project success while maintaining the highest safety and environmental standards.

Your One-Stop Partner for All Things Subsea

Need a Trusted Partner for Your Next Project?
Our multidisciplinary teams deliver reliable solutions across survey, diving, lifting, and engineering — ensuring success from concept to completion.

Table of Contents

Stay Updated

Get the latest insights on offshore operations and marine technology delivered to your inbox.

Scroll to Top